ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Wood products, not elsewhere classified
3+ Characters Required for Products

90

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $475k 114k
MMBtu
$7.87
- Electrical $248k 4,920k
kWh
$0.065
- Natural Gas $67k 16k
MMBtu
$3.43

654

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 4.1k
MMBtu
3.6%
- Electrical $29k 399k
kWh
8.1%
- Natural Gas $6.0k -
MMBtu
-
Waste $3.8k
Productivity/Other $72k
TOTAL $120k
*May be negative reflecting an increased cost component required to save energy and costs overall

87

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $475k 117k
MMBtu
$7.69
- Electrical $244k 4,957k
kWh
$0.063
- Natural Gas $69k 16k
MMBtu
$3.48

316

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 2.2k
MMBtu
1.9%
- Electrical $13k 213k
kWh
4.3%
- Natural Gas $1.6k -
MMBtu
-
Waste $0.6k
Productivity/Other $26k
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall