ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Wood preserving
3+ Characters Required for Products

54

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $388k 80k
MMBtu
$6.98
- Electrical $145k 2,466k
kWh
$0.064
- Natural Gas $120k 24k
MMBtu
$4.36

402

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $49k 2.6k
MMBtu
3.3%
- Electrical $16k 257k
kWh
10.4%
- Natural Gas $18k -
MMBtu
-
Waste $1.2k
Productivity/Other $21k
TOTAL $71k
*May be negative reflecting an increased cost component required to save energy and costs overall

48

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $353k 85k
MMBtu
$5.91
- Electrical $143k 2,482k
kWh
$0.062
- Natural Gas $121k 25k
MMBtu
$4.07

212

Implemented Recommendations

4.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 1.7k
MMBtu
2.0%
- Electrical $10k 165k
kWh
6.6%
- Natural Gas $7.3k -
MMBtu
-
Waste $0.4k
Productivity/Other $16k
TOTAL $38k
*May be negative reflecting an increased cost component required to save energy and costs overall