ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous wood products
3+ Characters Required for Products

199

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,073k 287k
MMBtu
$6.60
- Electrical $572k 13,688k
kWh
$0.059
- Natural Gas $235k 73k
MMBtu
$3.59

1,451

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $116k 16k
MMBtu
5.6%
- Electrical $68k 1,574k
kWh
11.5%
- Natural Gas $21k -
MMBtu
-
Waste $3.7k
Productivity/Other $58k
TOTAL $177k
*May be negative reflecting an increased cost component required to save energy and costs overall

190

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,086k 297k
MMBtu
$6.34
- Electrical $575k 14,019k
kWh
$0.058
- Natural Gas $243k 76k
MMBtu
$3.56

691

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 2.8k
MMBtu
0.9%
- Electrical $15k 271k
kWh
1.9%
- Natural Gas $8.1k -
MMBtu
-
Waste $1.3k
Productivity/Other $21k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall