ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Wood buildings and mobile homes
3+ Characters Required for Products

78

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $147k 18k
MMBtu
$8.68
- Electrical $69k 1,132k
kWh
$0.080
- Natural Gas $39k 5.5k
MMBtu
$4.46

517

Recommendations

6.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $95k 9.9k
MMBtu
54.2%
- Electrical $71k 962k
kWh
84.9%
- Natural Gas $3.3k -
MMBtu
-
Waste $7.8k
Productivity/Other $27k
TOTAL $130k
*May be negative reflecting an increased cost component required to save energy and costs overall

76

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $147k 18k
MMBtu
$8.57
- Electrical $69k 1,140k
kWh
$0.081
- Natural Gas $39k 5.6k
MMBtu
$4.29

242

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $12k 0.9k
MMBtu
4.7%
- Electrical $6.1k 84k
kWh
7.4%
- Natural Gas $2.0k -
MMBtu
-
Waste $5.1k
Productivity/Other $8.6k
TOTAL $25k
*May be negative reflecting an increased cost component required to save energy and costs overall