ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Wood pallets and skids
3+ Characters Required for Products

26

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $205k 24k
MMBtu
$11.75
- Electrical $106k 1,452k
kWh
$0.088
- Natural Gas $39k 7.7k
MMBtu
$2.21

183

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 2.2k
MMBtu
9.2%
- Electrical $18k 215k
kWh
14.8%
- Natural Gas $1.9k -
MMBtu
-
Waste $1.8k
Productivity/Other $54k
TOTAL $96k
*May be negative reflecting an increased cost component required to save energy and costs overall

23

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $181k 23k
MMBtu
$9.50
- Electrical $94k 1,378k
kWh
$0.070
- Natural Gas $40k 8.0k
MMBtu
$2.27

83

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $11k 1.0k
MMBtu
4.5%
- Electrical $6.8k 100k
kWh
7.3%
- Natural Gas $1.0k -
MMBtu
-
Waste $1.5k
Productivity/Other $12k
TOTAL $24k
*May be negative reflecting an increased cost component required to save energy and costs overall