ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Wood containers
3+ Characters Required for Products

42

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $276k 37k
MMBtu
$10.02
- Electrical $153k 2,308k
kWh
$0.082
- Natural Gas $53k 9.4k
MMBtu
$4.05

283

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 2.1k
MMBtu
5.8%
- Electrical $16k 206k
kWh
8.9%
- Natural Gas $2.5k -
MMBtu
-
Waste $5.0k
Productivity/Other $41k
TOTAL $79k
*May be negative reflecting an increased cost component required to save energy and costs overall

37

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $242k 35k
MMBtu
$8.41
- Electrical $139k 2,163k
kWh
$0.071
- Natural Gas $51k 9.6k
MMBtu
$3.88

140

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $11k 1.1k
MMBtu
3.0%
- Electrical $7.0k 105k
kWh
4.9%
- Natural Gas $1.2k -
MMBtu
-
Waste $3.8k
Productivity/Other $16k
TOTAL $31k
*May be negative reflecting an increased cost component required to save energy and costs overall