ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Wood containers
3+ Characters Required for Products

37

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $241k 36k
MMBtu
$8.18
- Electrical $137k 2,166k
kWh
$0.070
- Natural Gas $53k 10.0k
MMBtu
$4.02

256

Recommendations

6.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 2.0k
MMBtu
5.6%
- Electrical $14k 196k
kWh
9.1%
- Natural Gas $2.2k -
MMBtu
-
Waste $5.7k
Productivity/Other $34k
TOTAL $67k
*May be negative reflecting an increased cost component required to save energy and costs overall

36

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $241k 36k
MMBtu
$8.20
- Electrical $138k 2,174k
kWh
$0.070
- Natural Gas $52k 9.8k
MMBtu
$3.98

133

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $10k 1.0k
MMBtu
2.9%
- Electrical $6.5k 102k
kWh
4.7%
- Natural Gas $1.2k -
MMBtu
-
Waste $3.9k
Productivity/Other $12k
TOTAL $26k