ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Wood containers
3+ Characters Required for Products

43

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $293k 37k
MMBtu
$10.10
- Electrical $155k 2,390k
kWh
$0.081
- Natural Gas $55k 9.5k
MMBtu
$4.15

290

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $36k 2.5k
MMBtu
6.7%
- Electrical $17k 244k
kWh
10.2%
- Natural Gas $2.5k -
MMBtu
-
Waste $4.9k
Productivity/Other $40k
TOTAL $81k
*May be negative reflecting an increased cost component required to save energy and costs overall

38

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $257k 36k
MMBtu
$8.58
- Electrical $145k 2,212k
kWh
$0.071
- Natural Gas $50k 9.3k
MMBtu
$3.78

142

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $11k 1.1k
MMBtu
3.0%
- Electrical $7.0k 104k
kWh
4.7%
- Natural Gas $1.1k -
MMBtu
-
Waste $3.7k
Productivity/Other $16k
TOTAL $30k
*May be negative reflecting an increased cost component required to save energy and costs overall