ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Hardwood veneer and plywood
3+ Characters Required for Products

56

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,002k 413k
MMBtu
$4.67
- Electrical $623k 12,272k
kWh
$0.052
- Natural Gas $84k 21k
MMBtu
$3.64

374

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $132k 19k
MMBtu
4.7%
- Electrical $94k 1,896k
kWh
15.5%
- Natural Gas ($-15.5)k -
MMBtu
-
Waste $2.0k
Productivity/Other $28k
TOTAL $162k
*May be negative reflecting an increased cost component required to save energy and costs overall

56

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,002k 413k
MMBtu
$4.67
- Electrical $623k 12,272k
kWh
$0.052
- Natural Gas $84k 21k
MMBtu
$3.64

177

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 5.3k
MMBtu
1.3%
- Electrical $28k 521k
kWh
4.2%
- Natural Gas $4.0k -
MMBtu
-
Waste $0.2k
Productivity/Other $3.9k
TOTAL $44k
*May be negative reflecting an increased cost component required to save energy and costs overall