ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Wood kitchen cabinets
3+ Characters Required for Products

61

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $320k 52k
MMBtu
$8.17
- Electrical $193k 3,268k
kWh
$0.061
- Natural Gas $40k 6.7k
MMBtu
$4.89

443

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $49k 4.7k
MMBtu
9.0%
- Electrical $32k 461k
kWh
14.1%
- Natural Gas $3.2k -
MMBtu
-
Waste $4.1k
Productivity/Other $23k
TOTAL $76k
*May be negative reflecting an increased cost component required to save energy and costs overall

57

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $305k 52k
MMBtu
$7.63
- Electrical $181k 3,149k
kWh
$0.059
- Natural Gas $38k 6.4k
MMBtu
$4.81

209

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 1.6k
MMBtu
3.2%
- Electrical $11k 160k
kWh
5.1%
- Natural Gas $1.6k -
MMBtu
-
Waste $0.7k
Productivity/Other $10k
TOTAL $28k
*May be negative reflecting an increased cost component required to save energy and costs overall