ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Millwork
3+ Characters Required for Products

162

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $374k 72k
MMBtu
$7.81
- Electrical $222k 4,424k
kWh
$0.060
- Natural Gas $53k 8.7k
MMBtu
$4.53

1,179

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 4.9k
MMBtu
6.9%
- Electrical $27k 483k
kWh
10.9%
- Natural Gas $8.3k -
MMBtu
-
Waste $3.5k
Productivity/Other $50k
TOTAL $99k
*May be negative reflecting an increased cost component required to save energy and costs overall

160

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $370k 72k
MMBtu
$7.76
- Electrical $221k 4,412k
kWh
$0.060
- Natural Gas $53k 8.8k
MMBtu
$4.46

484

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.6k
MMBtu
2.3%
- Electrical $8.4k 160k
kWh
3.6%
- Natural Gas $1.3k -
MMBtu
-
Waste $1.2k
Productivity/Other $16k
TOTAL $30k
*May be negative reflecting an increased cost component required to save energy and costs overall