ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Millwork, veneer, plywood, and structural wood
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $238k 63k
MMBtu
$6.78
- Electrical $201k 2,378k
kWh
$0.085
- Natural Gas $7.2k 1.6k
MMBtu
$2.96

18

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $26k 1.6k
MMBtu
2.6%
- Electrical $24k 159k
kWh
6.7%
- Natural Gas -
-
MMBtu
-
Waste $1.0k
Productivity/Other -
TOTAL $27k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $238k 63k
MMBtu
$6.78
- Electrical $201k 2,378k
kWh
$0.085
- Natural Gas $7.2k 1.6k
MMBtu
$2.96

14

Implemented Recommendations

4.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 1.5k
MMBtu
2.4%
- Electrical $12k 147k
kWh
6.2%
- Natural Gas -
-
MMBtu
-
Waste $1.0k
Productivity/Other -
TOTAL $15k
*May be negative reflecting an increased cost component required to save energy and costs overall