ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Special product sawmills, not elsewhere classified
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $457k 37k
MMBtu
$12.52
- Electrical $347k 3,407k
kWh
$0.10
- Natural Gas $9.7k 1.6k
MMBtu
$6.07

6

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $88k 5.6k
MMBtu
15.3%
- Electrical $44k 546k
kWh
16.0%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $0.4k
TOTAL $89k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $457k 37k
MMBtu
$12.52
- Electrical $347k 3,407k
kWh
$0.10
- Natural Gas $9.7k 1.6k
MMBtu
$6.07

1

Implemented Recommendations

1.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $5.7k 0.6k
MMBtu
1.7%
- Electrical $4.6k 60k
kWh
1.8%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $5.7k
*May be negative reflecting an increased cost component required to save energy and costs overall