ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Hardwood dimension and flooring mills
3+ Characters Required for Products

66

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $574k 131k
MMBtu
$5.98
- Electrical $345k 6,955k
kWh
$0.057
- Natural Gas $40k 7.8k
MMBtu
$3.88

536

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $102k 14k
MMBtu
11.0%
- Electrical $75k 1,409k
kWh
20.3%
- Natural Gas $7.3k -
MMBtu
-
Waste $6.4k
Productivity/Other $26k
TOTAL $135k
*May be negative reflecting an increased cost component required to save energy and costs overall

63

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $560k 132k
MMBtu
$5.90
- Electrical $334k 6,947k
kWh
$0.056
- Natural Gas $29k 6.5k
MMBtu
$3.57

236

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 3.1k
MMBtu
2.4%
- Electrical $18k 306k
kWh
4.4%
- Natural Gas $6.5k -
MMBtu
-
Waste $2.4k
Productivity/Other $1.3k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall