ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Sawmills and planing mills, general
3+ Characters Required for Products

279

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $892k 259k
MMBtu
$6.12
- Electrical $551k 10,715k
kWh
$0.060
- Natural Gas $96k 20k
MMBtu
$2.13

1,907

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $119k 17k
MMBtu
6.7%
- Electrical $89k 1,700k
kWh
15.9%
- Natural Gas $3.1k -
MMBtu
-
Waste $0.4k
Productivity/Other $140k
TOTAL $259k
*May be negative reflecting an increased cost component required to save energy and costs overall

275

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $870k 259k
MMBtu
$6.07
- Electrical $529k 10,469k
kWh
$0.060
- Natural Gas $97k 20k
MMBtu
$2.14

972

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $42k 5.7k
MMBtu
2.2%
- Electrical $32k 557k
kWh
5.3%
- Natural Gas $3.3k -
MMBtu
-
Waste $0.4k
Productivity/Other $16k
TOTAL $58k
*May be negative reflecting an increased cost component required to save energy and costs overall