ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Sawmills and planing mills, general
3+ Characters Required for Products

278

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $886k 259k
MMBtu
$6.11
- Electrical $543k 10,650k
kWh
$0.060
- Natural Gas $97k 20k
MMBtu
$2.14

1,903

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $119k 17k
MMBtu
6.7%
- Electrical $89k 1,703k
kWh
16.0%
- Natural Gas $3.2k -
MMBtu
-
Waste $0.5k
Productivity/Other $140k
TOTAL $260k
*May be negative reflecting an increased cost component required to save energy and costs overall

273

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $872k 260k
MMBtu
$6.03
- Electrical $530k 10,520k
kWh
$0.060
- Natural Gas $97k 20k
MMBtu
$2.11

964

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $42k 5.7k
MMBtu
2.2%
- Electrical $32k 560k
kWh
5.3%
- Natural Gas $3.2k -
MMBtu
-
Waste $0.4k
Productivity/Other $16k
TOTAL $58k
*May be negative reflecting an increased cost component required to save energy and costs overall