Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Sawmills and planing mills, general
3+ Characters Required for Products

285

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $896k 256k
MMBtu
$6.24
- Electrical $554k 10,692k
kWh
$0.061
- Natural Gas $96k 20k
MMBtu
$2.16

1,936

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $118k 17k
MMBtu
6.7%
- Electrical $88k 1,672k
kWh
15.6%
- Natural Gas $3.2k -
MMBtu
-
Waste $0.4k
Productivity/Other $137k
TOTAL $255k
*May be negative reflecting an increased cost component required to save energy and costs overall

281

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $894k 258k
MMBtu
$6.15
- Electrical $552k 10,706k
kWh
$0.061
- Natural Gas $96k 20k
MMBtu
$2.14

979

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 5.6k
MMBtu
2.2%
- Electrical $31k 547k
kWh
5.1%
- Natural Gas $3.2k -
MMBtu
-
Waste $0.4k
Productivity/Other $15k
TOTAL $57k
*May be negative reflecting an increased cost component required to save energy and costs overall