ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Sawmills and planing mills
3+ Characters Required for Products

349

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $823k 232k
MMBtu
$6.14
- Electrical $502k 9,883k
kWh
$0.060
- Natural Gas $85k 17k
MMBtu
$2.48

2,477

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $117k 17k
MMBtu
7.2%
- Electrical $86k 1,638k
kWh
16.6%
- Natural Gas $4.0k -
MMBtu
-
Waste $1.6k
Productivity/Other $117k
TOTAL $235k
*May be negative reflecting an increased cost component required to save energy and costs overall

341

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $810k 234k
MMBtu
$6.06
- Electrical $490k 9,792k
kWh
$0.059
- Natural Gas $84k 17k
MMBtu
$2.40

1,218

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 5.2k
MMBtu
2.2%
- Electrical $29k 505k
kWh
5.2%
- Natural Gas $3.9k -
MMBtu
-
Waste $0.8k
Productivity/Other $13k
TOTAL $55k
*May be negative reflecting an increased cost component required to save energy and costs overall