ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Lumber and wood products, except furniture
3+ Characters Required for Products

1,031

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $732k 206k
MMBtu
$6.76
- Electrical $416k 8,795k
kWh
$0.068
- Natural Gas $112k 29k
MMBtu
$3.64

7,252

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $95k 13k
MMBtu
6.2%
- Electrical $63k 1,234k
kWh
14.0%
- Natural Gas $7.2k -
MMBtu
-
Waste $3.1k
Productivity/Other $77k
TOTAL $175k
*May be negative reflecting an increased cost component required to save energy and costs overall

1,007

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $731k 208k
MMBtu
$6.64
- Electrical $414k 8,836k
kWh
$0.068
- Natural Gas $113k 30k
MMBtu
$3.59

3,427

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 3.4k
MMBtu
1.7%
- Electrical $19k 336k
kWh
3.8%
- Natural Gas $4.0k -
MMBtu
-
Waste $1.3k
Productivity/Other $15k
TOTAL $45k
*May be negative reflecting an increased cost component required to save energy and costs overall