ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Automotive trimmings, apparel findings, and related products
3+ Characters Required for Products

25

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $423k 269k
MMBtu
$7.66
- Electrical $232k 4,554k
kWh
$0.060
- Natural Gas $86k 220k
MMBtu
$5.17

171

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 5.0k
MMBtu
1.8%
- Electrical $29k 486k
kWh
10.7%
- Natural Gas $8.1k -
MMBtu
-
Waste $5.4k
Productivity/Other $41k
TOTAL $90k
*May be negative reflecting an increased cost component required to save energy and costs overall

24

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $435k 280k
MMBtu
$7.51
- Electrical $236k 4,700k
kWh
$0.058
- Natural Gas $89k 229k
MMBtu
$4.89

87

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 2.2k
MMBtu
0.8%
- Electrical $12k 214k
kWh
4.6%
- Natural Gas $2.4k -
MMBtu
-
Waste $4.2k
Productivity/Other $5.5k
TOTAL $27k
*May be negative reflecting an increased cost component required to save energy and costs overall