ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Canvas and related products
3+ Characters Required for Products

14

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $342k 65k
MMBtu
$9.06
- Electrical $129k 2,577k
kWh
$0.072
- Natural Gas $136k 36k
MMBtu
$8.46

94

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $58k 6.8k
MMBtu
10.4%
- Electrical $44k 661k
kWh
25.6%
- Natural Gas ($-9.8)k -
MMBtu
-
Waste $0.8k
Productivity/Other $29k
TOTAL $88k
*May be negative reflecting an increased cost component required to save energy and costs overall

13

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $344k 68k
MMBtu
$8.62
- Electrical $125k 2,688k
kWh
$0.065
- Natural Gas $138k 38k
MMBtu
$8.24

30

Implemented Recommendations

2.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $3.9k 0.4k
MMBtu
0.6%
- Electrical $2.4k 41k
kWh
1.5%
- Natural Gas $0.9k -
MMBtu
-
Waste $0.7k
Productivity/Other $13k
TOTAL $18k
*May be negative reflecting an increased cost component required to save energy and costs overall