ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC House furnishing, except curtains and draperies
3+ Characters Required for Products

32

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $287k 54k
MMBtu
$6.88
- Electrical $158k 3,224k
kWh
$0.060
- Natural Gas $86k 16k
MMBtu
$5.53

244

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 2.9k
MMBtu
5.4%
- Electrical $20k 285k
kWh
8.8%
- Natural Gas $6.8k -
MMBtu
-
Waste $4.5k
Productivity/Other $8.0k
TOTAL $43k
*May be negative reflecting an increased cost component required to save energy and costs overall

32

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $287k 54k
MMBtu
$6.88
- Electrical $158k 3,224k
kWh
$0.060
- Natural Gas $86k 16k
MMBtu
$5.53

142

Implemented Recommendations

4.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $15k 1.6k
MMBtu
3.0%
- Electrical $9.8k 160k
kWh
5.0%
- Natural Gas $4.2k -
MMBtu
-
Waste $2.8k
Productivity/Other $6.6k
TOTAL $24k
*May be negative reflecting an increased cost component required to save energy and costs overall