ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous fabricated textile products
3+ Characters Required for Products

120

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $354k 104k
MMBtu
$7.29
- Electrical $194k 3,922k
kWh
$0.15
- Natural Gas $96k 62k
MMBtu
$5.38

842

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 4.0k
MMBtu
3.8%
- Electrical $24k 388k
kWh
9.9%
- Natural Gas $12k -
MMBtu
-
Waste $3.4k
Productivity/Other $46k
TOTAL $91k
*May be negative reflecting an increased cost component required to save energy and costs overall

118

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $350k 104k
MMBtu
$7.27
- Electrical $189k 3,835k
kWh
$0.15
- Natural Gas $97k 63k
MMBtu
$5.37

439

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.5k
MMBtu
1.5%
- Electrical $8.5k 149k
kWh
3.9%
- Natural Gas $3.2k -
MMBtu
-
Waste $2.0k
Productivity/Other $23k
TOTAL $38k
*May be negative reflecting an increased cost component required to save energy and costs overall