ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Leather and sheep-lined clothing
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $195k 39k
MMBtu
$5.00
- Electrical $137k 1,672k
kWh
$0.082
- Natural Gas -
-
MMBtu
-

5

Recommendations

5.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $8.1k 0.8k
MMBtu
2.0%
- Electrical $7.7k 75k
kWh
4.5%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $2.0k
TOTAL $10k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $195k 39k
MMBtu
$5.00
- Electrical $137k 1,672k
kWh
$0.082
- Natural Gas -
-
MMBtu
-

1

Implemented Recommendations

1.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $1.1k 0.1k
MMBtu
0.4%
- Electrical $1.1k 14k
kWh
0.8%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $1.1k
*May be negative reflecting an increased cost component required to save energy and costs overall