ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fur goods
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $397k 123k
MMBtu
$3.22
- Electrical $192k 6,501k
kWh
$0.030
- Natural Gas $67k 57k
MMBtu
$1.17

17

Recommendations

17.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $50k 11k
MMBtu
8.9%
- Electrical $35k 1,069k
kWh
16.4%
- Natural Gas $8.1k -
MMBtu
-
Waste $12k
Productivity/Other $85k
TOTAL $147k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $397k 123k
MMBtu
$3.22
- Electrical $192k 6,501k
kWh
$0.030
- Natural Gas $67k 57k
MMBtu
$1.17

0

Implemented Recommendations

0.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy -
-
MMBtu
-
- Electrical -
-
kWh
-
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL -
*May be negative reflecting an increased cost component required to save energy and costs overall