The ITAC Statistics page displays the average assessment results for the selected criteria.
14
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $170k | 36k |
MMBtu
|
$6.01 |
- Electrical | $106k | 2,060k |
kWh
|
$0.057 |
- Natural Gas | $47k | 14k |
MMBtu
|
$3.65 |
88
Recommendations
6.3
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $20k | 2.2k |
MMBtu
|
6.1% |
- Electrical | $11k | 213k |
kWh
|
10.4% |
- Natural Gas | $3.6k | - |
MMBtu
|
- |
Waste | $0.0k | |||
Productivity/Other | $8.8k | |||
TOTAL | $28k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
14
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $170k | 36k |
MMBtu
|
$6.01 |
- Electrical | $106k | 2,060k |
kWh
|
$0.057 |
- Natural Gas | $47k | 14k |
MMBtu
|
$3.65 |
59
Implemented Recommendations
4.2
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $10k | 1.1k |
MMBtu
|
3.0% |
- Electrical | $6.4k | 107k |
kWh
|
5.2% |
- Natural Gas | $3.3k | - |
MMBtu
|
- |
Waste | $0.0k | |||
Productivity/Other | $0.1k | |||
TOTAL | $10k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |