ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Girls', children's, and infants' outerwear
3+ Characters Required for Products

14

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $170k 36k
MMBtu
$6.01
- Electrical $106k 2,060k
kWh
$0.057
- Natural Gas $47k 14k
MMBtu
$3.65

88

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 2.2k
MMBtu
6.1%
- Electrical $11k 213k
kWh
10.4%
- Natural Gas $3.6k -
MMBtu
-
Waste $0.0k
Productivity/Other $8.8k
TOTAL $28k
*May be negative reflecting an increased cost component required to save energy and costs overall

14

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $170k 36k
MMBtu
$6.01
- Electrical $106k 2,060k
kWh
$0.057
- Natural Gas $47k 14k
MMBtu
$3.65

59

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $10k 1.1k
MMBtu
3.0%
- Electrical $6.4k 107k
kWh
5.2%
- Natural Gas $3.3k -
MMBtu
-
Waste $0.0k
Productivity/Other $0.1k
TOTAL $10k