ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Women's, misses', children's, and infants'
3+ Characters Required for Products

16

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $116k 16k
MMBtu
$7.66
- Electrical $85k 1,198k
kWh
$0.081
- Natural Gas $20k 3.3k
MMBtu
$4.45

95

Recommendations

5.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.7k
MMBtu
16.8%
- Electrical $18k 264k
kWh
22.0%
- Natural Gas $5.8k -
MMBtu
-
Waste $0.7k
Productivity/Other $0.4k
TOTAL $26k
*May be negative reflecting an increased cost component required to save energy and costs overall

16

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $116k 16k
MMBtu
$7.66
- Electrical $85k 1,198k
kWh
$0.081
- Natural Gas $20k 3.3k
MMBtu
$4.45

32

Implemented Recommendations

2.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $6.0k 0.5k
MMBtu
2.8%
- Electrical $4.1k 45k
kWh
3.7%
- Natural Gas $1.6k -
MMBtu
-
Waste -
Productivity/Other ($0.0)k
TOTAL $5.9k
*May be negative reflecting an increased cost component required to save energy and costs overall