ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Women's, misses', and juniors' suits, skirts, and coats
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $99k 17k
MMBtu
$5.94
- Electrical $71k 1,091k
kWh
$0.075
- Natural Gas $25k 5.1k
MMBtu
$4.11

27

Recommendations

5.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $12k 1.9k
MMBtu
11.1%
- Electrical $11k 182k
kWh
16.7%
- Natural Gas $1.2k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $13k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $99k 17k
MMBtu
$5.94
- Electrical $71k 1,091k
kWh
$0.075
- Natural Gas $25k 5.1k
MMBtu
$4.11

4

Implemented Recommendations

0.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $1.5k 0.3k
MMBtu
2.0%
- Electrical $1.3k 32k
kWh
3.0%
- Natural Gas $0.2k -
MMBtu
-
Waste -
Productivity/Other ($0.0)k
TOTAL $1.5k
*May be negative reflecting an increased cost component required to save energy and costs overall