ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC Use waste heat steam for absorption refrigeration
NAICS 3+ Digits Required
SIC Women's, misses', and juniors' outerwear
3+ Characters Required for Products

28

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $117k 19k
MMBtu
$6.64
- Electrical $70k 1,141k
kWh
$0.075
- Natural Gas $38k 6.7k
MMBtu
$3.97

186

Recommendations

6.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 1.5k
MMBtu
7.9%
- Electrical $11k 148k
kWh
13.0%
- Natural Gas $3.0k -
MMBtu
-
Waste $0.2k
Productivity/Other $1.8k
TOTAL $18k
*May be negative reflecting an increased cost component required to save energy and costs overall

28

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $117k 19k
MMBtu
$6.64
- Electrical $70k 1,141k
kWh
$0.075
- Natural Gas $38k 6.7k
MMBtu
$3.97

98

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $9.6k 0.9k
MMBtu
4.6%
- Electrical $6.3k 86k
kWh
7.6%
- Natural Gas $1.6k -
MMBtu
-
Waste -
Productivity/Other $1.6k
TOTAL $11k
*May be negative reflecting an increased cost component required to save energy and costs overall