ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Men's and boys' underwear and nightwear
3+ Characters Required for Products

6

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $336k 76k
MMBtu
$5.33
- Electrical $143k 3,029k
kWh
$0.047
- Natural Gas $128k 40k
MMBtu
$4.35

37

Recommendations

6.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 3.4k
MMBtu
4.5%
- Electrical $13k 333k
kWh
11.0%
- Natural Gas $6.9k -
MMBtu
-
Waste $3.1k
Productivity/Other $4.7k
TOTAL $35k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $336k 76k
MMBtu
$5.33
- Electrical $143k 3,029k
kWh
$0.047
- Natural Gas $128k 40k
MMBtu
$4.35

16

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $12k 1.3k
MMBtu
1.7%
- Electrical $5.4k 123k
kWh
4.1%
- Natural Gas $3.1k -
MMBtu
-
Waste $1.1k
Productivity/Other $0.2k
TOTAL $13k