ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Men's and boys' shirts, except work shirts
3+ Characters Required for Products

17

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $193k 34k
MMBtu
$6.45
- Electrical $92k 2,408k
kWh
$0.058
- Natural Gas $39k 8.1k
MMBtu
$3.98

106

Recommendations

6.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 1.5k
MMBtu
4.4%
- Electrical $7.6k 146k
kWh
6.1%
- Natural Gas $10k -
MMBtu
-
Waste $0.7k
Productivity/Other $3.2k
TOTAL $24k
*May be negative reflecting an increased cost component required to save energy and costs overall

17

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $193k 34k
MMBtu
$6.45
- Electrical $92k 2,408k
kWh
$0.058
- Natural Gas $39k 8.1k
MMBtu
$3.98

49

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 0.7k
MMBtu
2.0%
- Electrical $3.0k 67k
kWh
2.8%
- Natural Gas $9.7k -
MMBtu
-
Waste ($-0.3)k
Productivity/Other ($0.0)k
TOTAL $14k
*May be negative reflecting an increased cost component required to save energy and costs overall