ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Men's and boys' suits, coats, and overcoats
3+ Characters Required for Products

19

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $257k 42k
MMBtu
$6.96
- Electrical $179k 2,897k
kWh
$0.065
- Natural Gas $52k 12k
MMBtu
$4.91

126

Recommendations

6.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 2.4k
MMBtu
5.6%
- Electrical $13k 231k
kWh
8.0%
- Natural Gas $4.8k -
MMBtu
-
Waste $1.6k
Productivity/Other $10.0k
TOTAL $32k
*May be negative reflecting an increased cost component required to save energy and costs overall

19

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $257k 42k
MMBtu
$6.96
- Electrical $179k 2,897k
kWh
$0.065
- Natural Gas $52k 12k
MMBtu
$4.91

75

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.3k
MMBtu
3.0%
- Electrical $8.5k 122k
kWh
4.2%
- Natural Gas $2.4k -
MMBtu
-
Waste $0.1k
Productivity/Other $0.7k
TOTAL $14k