ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Textile goods, not elsewhere classified
3+ Characters Required for Products

51

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $635k 111k
MMBtu
$7.28
- Electrical $380k 7,845k
kWh
$0.062
- Natural Gas $137k 24k
MMBtu
$5.04

355

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $92k 6.0k
MMBtu
5.4%
- Electrical $34k 588k
kWh
7.5%
- Natural Gas $43k -
MMBtu
-
Waste $9.4k
Productivity/Other $67k
TOTAL $169k
*May be negative reflecting an increased cost component required to save energy and costs overall

50

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $645k 113k
MMBtu
$7.15
- Electrical $387k 7,995k
kWh
$0.061
- Natural Gas $138k 24k
MMBtu
$4.94

182

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 2.1k
MMBtu
1.9%
- Electrical $11k 209k
kWh
2.6%
- Natural Gas $2.6k -
MMBtu
-
Waste $4.6k
Productivity/Other $2.2k
TOTAL $27k
*May be negative reflecting an increased cost component required to save energy and costs overall