ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cordage and twine
3+ Characters Required for Products

14

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $981k 166k
MMBtu
$7.47
- Electrical $927k 15,344k
kWh
$0.075
- Natural Gas $49k 8.2k
MMBtu
$5.76

104

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $72k 8.4k
MMBtu
5.1%
- Electrical $57k 823k
kWh
5.4%
- Natural Gas $15k -
MMBtu
-
Waste $9.6k
Productivity/Other $15k
TOTAL $97k
*May be negative reflecting an increased cost component required to save energy and costs overall

13

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,043k 177k
MMBtu
$7.39
- Electrical $984k 16,365k
kWh
$0.074
- Natural Gas $52k 8.9k
MMBtu
$6.20

55

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 3.2k
MMBtu
1.8%
- Electrical $21k 317k
kWh
1.9%
- Natural Gas $3.4k -
MMBtu
-
Waste -
Productivity/Other $8.4k
TOTAL $33k