ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Coated fabrics, not rubberized
3+ Characters Required for Products

33

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $863k 145k
MMBtu
$6.92
- Electrical $350k 6,752k
kWh
$0.064
- Natural Gas $348k 59k
MMBtu
$6.37

277

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $90k 3.4k
MMBtu
2.3%
- Electrical $27k 332k
kWh
4.9%
- Natural Gas $53k -
MMBtu
-
Waste $9.6k
Productivity/Other $48k
TOTAL $148k
*May be negative reflecting an increased cost component required to save energy and costs overall

32

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $882k 149k
MMBtu
$6.74
- Electrical $356k 6,919k
kWh
$0.062
- Natural Gas $357k 60k
MMBtu
$6.11

111

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 2.1k
MMBtu
1.4%
- Electrical $12k 209k
kWh
3.0%
- Natural Gas $4.0k -
MMBtu
-
Waste $0.6k
Productivity/Other $3.4k
TOTAL $24k