ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous textile goods
3+ Characters Required for Products

122

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $818k 137k
MMBtu
$7.13
- Electrical $493k 9,382k
kWh
$0.063
- Natural Gas $192k 32k
MMBtu
$5.39

902

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $94k 7.3k
MMBtu
5.3%
- Electrical $42k 709k
kWh
7.6%
- Natural Gas $39k -
MMBtu
-
Waste $8.4k
Productivity/Other $51k
TOTAL $154k
*May be negative reflecting an increased cost component required to save energy and costs overall

118

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $820k 139k
MMBtu
$7.06
- Electrical $498k 9,459k
kWh
$0.062
- Natural Gas $194k 33k
MMBtu
$5.45

436

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 2.3k
MMBtu
1.7%
- Electrical $13k 226k
kWh
2.4%
- Natural Gas $4.1k -
MMBtu
-
Waste $2.9k
Productivity/Other $10k
TOTAL $35k
*May be negative reflecting an increased cost component required to save energy and costs overall