ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Thread mills
3+ Characters Required for Products

11

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,062k 237k
MMBtu
$5.09
- Electrical $803k 20,407k
kWh
$0.048
- Natural Gas $114k 26k
MMBtu
$29.01

69

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $65k 12k
MMBtu
5.1%
- Electrical $54k 1,168k
kWh
5.7%
- Natural Gas $4.8k -
MMBtu
-
Waste $2.0k
Productivity/Other $4.2k
TOTAL $71k
*May be negative reflecting an increased cost component required to save energy and costs overall

11

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,062k 237k
MMBtu
$5.09
- Electrical $803k 20,407k
kWh
$0.048
- Natural Gas $114k 26k
MMBtu
$29.01

21

Implemented Recommendations

1.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 5.4k
MMBtu
2.3%
- Electrical $20k 525k
kWh
2.6%
- Natural Gas $0.6k -
MMBtu
-
Waste $0.3k
Productivity/Other $1.0k
TOTAL $24k
*May be negative reflecting an increased cost component required to save energy and costs overall