ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Carpets and rugs
3+ Characters Required for Products

87

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,109k 244k
MMBtu
$6.07
- Electrical $409k 11,682k
kWh
$0.057
- Natural Gas $486k 90k
MMBtu
$6.00

665

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $139k 8.3k
MMBtu
3.4%
- Electrical $44k 805k
kWh
6.9%
- Natural Gas $77k -
MMBtu
-
Waste $12k
Productivity/Other $56k
TOTAL $207k
*May be negative reflecting an increased cost component required to save energy and costs overall

79

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,122k 257k
MMBtu
$5.62
- Electrical $389k 12,030k
kWh
$0.053
- Natural Gas $517k 96k
MMBtu
$5.76

265

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $35k 2.8k
MMBtu
1.1%
- Electrical $14k 270k
kWh
2.2%
- Natural Gas $15k -
MMBtu
-
Waste $5.0k
Productivity/Other $4.6k
TOTAL $44k