ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
SIC 2269 Finishers of textiles, not elsewhere classified

32

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $911k 190k
MMBtu
$5.52
- Electrical $325k 5,912k
kWh
$0.058
- Natural Gas $400k 82k
MMBtu
$4.95

255

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $96k 4.5k
MMBtu
2.4%
- Electrical $31k 438k
kWh
7.4%
- Natural Gas $68k -
MMBtu
-
Waste $14k
Productivity/Other $4.5k
TOTAL $115k
*May be negative reflecting an increased cost component required to save energy and costs overall

30

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $914k 192k
MMBtu
$5.47
- Electrical $324k 5,914k
kWh
$0.058
- Natural Gas $398k 81k
MMBtu
$4.92

114

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 1.4k
MMBtu
0.7%
- Electrical $8.5k 132k
kWh
2.2%
- Natural Gas $23k -
MMBtu
-
Waste $2.5k
Productivity/Other ($-0.1)k
TOTAL $35k
*May be negative reflecting an increased cost component required to save energy and costs overall