ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Finishers of broadwoven fabrics of cotton
3+ Characters Required for Products

27

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $959k 186k
MMBtu
$6.80
- Electrical $312k 6,038k
kWh
$0.060
- Natural Gas $448k 85k
MMBtu
$5.53

178

Recommendations

6.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $103k 3.3k
MMBtu
1.8%
- Electrical $19k 318k
kWh
5.3%
- Natural Gas $63k -
MMBtu
-
Waste $7.8k
Productivity/Other $33k
TOTAL $143k
*May be negative reflecting an increased cost component required to save energy and costs overall

27

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $959k 186k
MMBtu
$6.80
- Electrical $312k 6,038k
kWh
$0.060
- Natural Gas $448k 85k
MMBtu
$5.53

76

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 1.8k
MMBtu
1.0%
- Electrical $9.7k 177k
kWh
2.9%
- Natural Gas $18k -
MMBtu
-
Waste $6.4k
Productivity/Other $10k
TOTAL $58k
*May be negative reflecting an increased cost component required to save energy and costs overall