The ITAC Statistics page displays the average assessment results for the selected criteria.
69
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $886k | 179k |
MMBtu
|
$5.91 |
- Electrical | $298k | 5,597k |
kWh
|
$0.059 |
- Natural Gas | $417k | 85k |
MMBtu
|
$5.06 |
516
Recommendations
7.5
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $97k | 3.7k |
MMBtu
|
2.1% |
- Electrical | $24k | 360k |
kWh
|
6.4% |
- Natural Gas | $66k | - |
MMBtu
|
- |
Waste | $13k | |||
Productivity/Other | $43k | |||
TOTAL | $153k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
66
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $893k | 181k |
MMBtu
|
$5.89 |
- Electrical | $299k | 5,645k |
kWh
|
$0.059 |
- Natural Gas | $420k | 85k |
MMBtu
|
$5.06 |
220
Implemented Recommendations
3.3
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $35k | 1.4k |
MMBtu
|
0.8% |
- Electrical | $8.3k | 141k |
kWh
|
2.5% |
- Natural Gas | $21k | - |
MMBtu
|
- |
Waste | $3.8k | |||
Productivity/Other | $4.2k | |||
TOTAL | $43k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |