ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Lace and warp knit fabric mills
3+ Characters Required for Products

14

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $636k 124k
MMBtu
$6.01
- Electrical $254k 4,800k
kWh
$0.056
- Natural Gas $212k 41k
MMBtu
$4.00

90

Recommendations

6.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $148k 9.1k
MMBtu
7.3%
- Electrical $41k 886k
kWh
18.5%
- Natural Gas $63k -
MMBtu
-
Waste $8.8k
Productivity/Other $15k
TOTAL $171k
*May be negative reflecting an increased cost component required to save energy and costs overall

14

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $636k 124k
MMBtu
$6.01
- Electrical $254k 4,800k
kWh
$0.056
- Natural Gas $212k 41k
MMBtu
$4.00

33

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $8.5k 0.7k
MMBtu
0.6%
- Electrical $3.2k 72k
kWh
1.5%
- Natural Gas $1.6k -
MMBtu
-
Waste -
Productivity/Other $0.1k
TOTAL $8.7k
*May be negative reflecting an increased cost component required to save energy and costs overall