ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Knit outerwear mills
3+ Characters Required for Products

11

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $538k 101k
MMBtu
$6.26
- Electrical $319k 4,906k
kWh
$0.058
- Natural Gas $120k 51k
MMBtu
$3.61

79

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $107k 12k
MMBtu
11.6%
- Electrical $93k 1,144k
kWh
23.3%
- Natural Gas $6.6k -
MMBtu
-
Waste $13k
Productivity/Other $3.0k
TOTAL $123k
*May be negative reflecting an increased cost component required to save energy and costs overall

11

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $538k 101k
MMBtu
$6.26
- Electrical $319k 4,906k
kWh
$0.058
- Natural Gas $120k 51k
MMBtu
$3.61

32

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $10k 0.6k
MMBtu
0.6%
- Electrical $3.2k 57k
kWh
1.2%
- Natural Gas $4.8k -
MMBtu
-
Waste $13k
Productivity/Other $1.0k
TOTAL $24k
*May be negative reflecting an increased cost component required to save energy and costs overall