ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Hosiery, not elsewhere classified
3+ Characters Required for Products

29

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $470k 86k
MMBtu
$5.68
- Electrical $225k 5,194k
kWh
$0.052
- Natural Gas $137k 26k
MMBtu
$4.91

206

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $37k 3.3k
MMBtu
3.9%
- Electrical $15k 323k
kWh
6.2%
- Natural Gas $18k -
MMBtu
-
Waste $2.2k
Productivity/Other $0.1k
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall

29

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $470k 86k
MMBtu
$5.68
- Electrical $225k 5,194k
kWh
$0.052
- Natural Gas $137k 26k
MMBtu
$4.91

117

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 1.3k
MMBtu
1.5%
- Electrical $6.3k 123k
kWh
2.4%
- Natural Gas $9.2k -
MMBtu
-
Waste $0.6k
Productivity/Other $0.1k
TOTAL $18k
*May be negative reflecting an increased cost component required to save energy and costs overall