ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Broadwoven fabric mills, wool (including dyeing and finishing)
3+ Characters Required for Products

28

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,011k 200k
MMBtu
$5.48
- Electrical $519k 9,001k
kWh
$0.066
- Natural Gas $273k 66k
MMBtu
$2.47

208

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $106k 8.3k
MMBtu
4.2%
- Electrical $57k 810k
kWh
9.0%
- Natural Gas $44k -
MMBtu
-
Waste $4.1k
Productivity/Other $9.5k
TOTAL $119k
*May be negative reflecting an increased cost component required to save energy and costs overall

28

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,011k 200k
MMBtu
$5.48
- Electrical $519k 9,001k
kWh
$0.066
- Natural Gas $273k 66k
MMBtu
$2.47

101

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 2.9k
MMBtu
1.4%
- Electrical $17k 282k
kWh
3.1%
- Natural Gas $11k -
MMBtu
-
Waste $0.6k
Productivity/Other $0.3k
TOTAL $35k
*May be negative reflecting an increased cost component required to save energy and costs overall