ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Broadwoven fabric mills, cotton
3+ Characters Required for Products

47

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,510k 363k
MMBtu
$4.75
- Electrical $1,077k 26,401k
kWh
$0.045
- Natural Gas $242k 57k
MMBtu
$3.56

351

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $121k 16k
MMBtu
4.4%
- Electrical $73k 1,553k
kWh
5.9%
- Natural Gas $33k -
MMBtu
-
Waste $2.4k
Productivity/Other $21k
TOTAL $144k
*May be negative reflecting an increased cost component required to save energy and costs overall

46

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,507k 366k
MMBtu
$4.70
- Electrical $1,066k 26,527k
kWh
$0.044
- Natural Gas $246k 58k
MMBtu
$3.53

151

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 7.3k
MMBtu
2.0%
- Electrical $28k 707k
kWh
2.7%
- Natural Gas $17k -
MMBtu
-
Waste $0.9k
Productivity/Other $2.8k
TOTAL $51k