ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Textile mill products
3+ Characters Required for Products

587

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $976k 197k
MMBtu
$6.01
- Electrical $536k 12,314k
kWh
$0.055
- Natural Gas $254k 51k
MMBtu
$5.01

4,273

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $101k 8.7k
MMBtu
4.4%
- Electrical $45k 845k
kWh
6.9%
- Natural Gas $40k -
MMBtu
-
Waste $8.5k
Productivity/Other $30k
TOTAL $139k
*May be negative reflecting an increased cost component required to save energy and costs overall

572

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $970k 198k
MMBtu
$5.94
- Electrical $532k 12,353k
kWh
$0.055
- Natural Gas $254k 51k
MMBtu
$4.97

1,964

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 3.5k
MMBtu
1.8%
- Electrical $16k 343k
kWh
2.8%
- Natural Gas $11k -
MMBtu
-
Waste $2.5k
Productivity/Other $5.8k
TOTAL $41k
*May be negative reflecting an increased cost component required to save energy and costs overall