The ITAC Statistics page displays the average assessment results for the selected criteria.
590
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $973k | 197k |
MMBtu
|
$6.03 |
- Electrical | $534k | 12,265k |
kWh
|
$0.056 |
- Natural Gas | $253k | 50k |
MMBtu
|
$5.02 |
4,294
Recommendations
7.3
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $100k | 8.6k |
MMBtu
|
4.4% |
- Electrical | $44k | 842k |
kWh
|
6.9% |
- Natural Gas | $40k | - |
MMBtu
|
- |
Waste | $8.4k | |||
Productivity/Other | $30k | |||
TOTAL | $139k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
572
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $970k | 198k |
MMBtu
|
$5.94 |
- Electrical | $532k | 12,353k |
kWh
|
$0.055 |
- Natural Gas | $254k | 51k |
MMBtu
|
$4.97 |
1,964
Implemented Recommendations
3.4
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $32k | 3.5k |
MMBtu
|
1.8% |
- Electrical | $16k | 343k |
kWh
|
2.8% |
- Natural Gas | $11k | - |
MMBtu
|
- |
Waste | $2.5k | |||
Productivity/Other | $5.8k | |||
TOTAL | $41k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |