The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC | Reduce temperature of process equipment when on standby | |
NAICS | 3+ Digits Required | |
SIC | Tobacco stemming and redrying | |
3+ Characters Required for Products |
4
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $1,762k | 293k |
MMBtu
|
$6.09 |
- Electrical | $768k | 19,143k |
kWh
|
$0.050 |
- Natural Gas | $283k | 57k |
MMBtu
|
$3.47 |
38
Recommendations
9.5
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $131k | 8.6k |
MMBtu
|
2.9% |
- Electrical | $36k | 835k |
kWh
|
4.4% |
- Natural Gas | $10k | - |
MMBtu
|
- |
Waste | $4.2k | |||
Productivity/Other | ($-0.3)k | |||
TOTAL | $135k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
4
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $1,762k | 293k |
MMBtu
|
$6.09 |
- Electrical | $768k | 19,143k |
kWh
|
$0.050 |
- Natural Gas | $283k | 57k |
MMBtu
|
$3.47 |
21
Implemented Recommendations
5.3
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $67k | 4.7k |
MMBtu
|
1.6% |
- Electrical | $27k | 456k |
kWh
|
2.4% |
- Natural Gas | $8.3k | - |
MMBtu
|
- |
Waste | $4.2k | |||
Productivity/Other | ($-0.5)k | |||
TOTAL | $71k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |