ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Chewing and smoking tobacco and snuff
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,515k 238k
MMBtu
$7.04
- Electrical $796k 15,407k
kWh
$0.053
- Natural Gas $357k 80k
MMBtu
$5.58

40

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $120k 15k
MMBtu
6.3%
- Electrical $85k 1,451k
kWh
9.4%
- Natural Gas $10k -
MMBtu
-
Waste $18k
Productivity/Other $5.8k
TOTAL $144k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,515k 238k
MMBtu
$7.04
- Electrical $796k 15,407k
kWh
$0.053
- Natural Gas $357k 80k
MMBtu
$5.58

26

Implemented Recommendations

5.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $104k 13k
MMBtu
5.5%
- Electrical $76k 1,278k
kWh
8.3%
- Natural Gas $5.5k -
MMBtu
-
Waste $12k
Productivity/Other $5.8k
TOTAL $122k
*May be negative reflecting an increased cost component required to save energy and costs overall