ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Chewing and smoking tobacco and snuff
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,211k 205k
MMBtu
$6.31
- Electrical $666k 13,761k
kWh
$0.049
- Natural Gas $278k 64k
MMBtu
$5.31

52

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $102k 12k
MMBtu
5.6%
- Electrical $72k 1,129k
kWh
8.2%
- Natural Gas $7.5k -
MMBtu
-
Waste $13k
Productivity/Other $15k
TOTAL $130k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,211k 205k
MMBtu
$6.31
- Electrical $666k 13,761k
kWh
$0.049
- Natural Gas $278k 64k
MMBtu
$5.31

33

Implemented Recommendations

4.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $78k 10k
MMBtu
5.0%
- Electrical $58k 999k
kWh
7.3%
- Natural Gas $4.0k -
MMBtu
-
Waste $8.5k
Productivity/Other $4.1k
TOTAL $91k
*May be negative reflecting an increased cost component required to save energy and costs overall