ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cigarettes
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $5,199k 861k
MMBtu
$7.26
- Electrical $2,122k 62,101k
kWh
$0.041
- Natural Gas $1,306k 225k
MMBtu
$3.75

53

Recommendations

10.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $625k 65k
MMBtu
7.5%
- Electrical $217k 6,334k
kWh
10.2%
- Natural Gas $272k -
MMBtu
-
Waste $2.2k
Productivity/Other $12k
TOTAL $640k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $5,199k 861k
MMBtu
$7.26
- Electrical $2,122k 62,101k
kWh
$0.041
- Natural Gas $1,306k 225k
MMBtu
$3.75

31

Implemented Recommendations

6.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $106k 21k
MMBtu
2.4%
- Electrical $74k 2,046k
kWh
3.3%
- Natural Gas $8.1k -
MMBtu
-
Waste $2.1k
Productivity/Other $2.3k
TOTAL $110k
*May be negative reflecting an increased cost component required to save energy and costs overall