Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Tobacco products
3+ Characters Required for Products

19

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,364k 385k
MMBtu
$7.49
- Electrical $1,084k 26,400k
kWh
$0.055
- Natural Gas $544k 105k
MMBtu
$4.66

163

Recommendations

8.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $250k 24k
MMBtu
6.2%
- Electrical $103k 2,320k
kWh
8.8%
- Natural Gas $84k -
MMBtu
-
Waste $6.8k
Productivity/Other $24k
TOTAL $281k
*May be negative reflecting an increased cost component required to save energy and costs overall

19

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,364k 385k
MMBtu
$7.49
- Electrical $1,084k 26,400k
kWh
$0.055
- Natural Gas $544k 105k
MMBtu
$4.66

91

Implemented Recommendations

4.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $77k 10k
MMBtu
2.7%
- Electrical $47k 1,004k
kWh
3.8%
- Natural Gas $11k -
MMBtu
-
Waste $5.0k
Productivity/Other $2.3k
TOTAL $84k