ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Potato chips, corn chips, and similar snacks
3+ Characters Required for Products

65

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $846k 176k
MMBtu
$5.87
- Electrical $315k 6,277k
kWh
$0.059
- Natural Gas $425k 106k
MMBtu
$4.42

477

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $68k 5.9k
MMBtu
3.3%
- Electrical $37k 573k
kWh
9.1%
- Natural Gas $25k -
MMBtu
-
Waste $12k
Productivity/Other $24k
TOTAL $105k
*May be negative reflecting an increased cost component required to save energy and costs overall

63

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $866k 180k
MMBtu
$5.69
- Electrical $322k 6,444k
kWh
$0.057
- Natural Gas $436k 109k
MMBtu
$4.29

242

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 2.8k
MMBtu
1.5%
- Electrical $17k 268k
kWh
4.2%
- Natural Gas $7.7k -
MMBtu
-
Waste $5.5k
Productivity/Other $6.9k
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall