ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Roasted coffee
3+ Characters Required for Products

32

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $597k 97k
MMBtu
$7.88
- Electrical $370k 5,742k
kWh
$0.083
- Natural Gas $175k 37k
MMBtu
$5.50

208

Recommendations

6.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $51k 3.6k
MMBtu
3.7%
- Electrical $25k 351k
kWh
6.1%
- Natural Gas $20k -
MMBtu
-
Waste $1.2k
Productivity/Other $12k
TOTAL $63k
*May be negative reflecting an increased cost component required to save energy and costs overall

30

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $610k 100k
MMBtu
$7.32
- Electrical $382k 6,026k
kWh
$0.077
- Natural Gas $175k 38k
MMBtu
$5.38

80

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $12k 0.9k
MMBtu
0.9%
- Electrical $5.4k 89k
kWh
1.5%
- Natural Gas $5.0k -
MMBtu
-
Waste $0.5k
Productivity/Other $1.7k
TOTAL $14k
*May be negative reflecting an increased cost component required to save energy and costs overall