ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Roasted coffee
3+ Characters Required for Products

31

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $595k 97k
MMBtu
$7.84
- Electrical $371k 5,839k
kWh
$0.082
- Natural Gas $170k 37k
MMBtu
$5.48

201

Recommendations

6.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $50k 3.6k
MMBtu
3.7%
- Electrical $25k 353k
kWh
6.0%
- Natural Gas $19k -
MMBtu
-
Waste $1.2k
Productivity/Other $12k
TOTAL $63k
*May be negative reflecting an increased cost component required to save energy and costs overall

28

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $626k 105k
MMBtu
$7.15
- Electrical $392k 6,271k
kWh
$0.076
- Natural Gas $180k 39k
MMBtu
$5.44

75

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $9.9k 0.9k
MMBtu
0.9%
- Electrical $5.5k 92k
kWh
1.5%
- Natural Gas $2.7k -
MMBtu
-
Waste $0.6k
Productivity/Other $1.8k
TOTAL $12k